develop a concept for the commercial/ retail /gallery and public use of the building on the lower areas. 1. 1: ground floor with ~2100 sqft gallery space (optional suitable commercial or retail), remaining is for Lobby, reception, elevator, egress stair, mechanical.
2. 2: 2 nd Floor and partial 3rd Floor with ~2000sqft (depends on the actual Highline height). This area is intended to give additional amenities to the residential units in terms of leisure or service. It is planned to be a semi-public area and may give access to the highline.
3. 3: Vacant Space under the Highline along the frontage of the building in length of 60’ should be designed for public or partial commercial use
4. 4: Lot space south of the building should be designed for semi public use of tenants only. This area should offer green and outdoor communal spaces.
discussion Monday 18:
No comments:
Post a Comment